We have positioned ourselves within the Facade industry to undertake the fire remediation works of all buildings with non-compliant building facade materials. 

One SE8, London

OAK FACADES

Client: St James (Berkeley Group)

Fire Remedial Works package to the facade of 15 residential blocks: we worked with the design team to develop & propose a design to change the existing timber construction to a non-combustible system to allow for the issue of the EWS1 for residents.

Value: £1.6m

Worcester Park, London

OAK FACADES

Client: St James

Fire Remedial Works package to residential houses & apartments: Oak carried out the remedial works to the external facades includes removing localised sections of cladding & installing fire breaks to walls, eaves, doors & windows, with residents occupying their properties.

Value: £1m

Flow Building, Staines

OAK FACADES

Client: Galliford Try

Fire Remedial Works package to existing office building: Oak was required to carry out removal of existing Kingspan K15 insulation & replace with Rockwool DuoSlab insulation along with new fire cavity barriers to maintain fire compartmentation. All glazing units removed & replaced.

Value: £1.4m


Blake House, 3 Frayswater Place, Uxbridge, UB8 2AD

info@oakss.co.uk

Tel: 020 3827 3790

Modern Slavery

Privacy

Modern Slavery StatementDownload